Arazim Reports

Free templates / Site visit report

Site visit report template

Free · US Letter · Print or save as PDF · No sign-up

A two-page report for the design team's visits during construction administration: stage of work, observations with drawing references and required action, items carried from earlier visits, RFIs and submittals, photos, and a limitation statement.

A site visit report from the architect or engineer has a narrower job than a superintendent's log. It records what the design team saw on a given day, whether the work appears to follow the contract documents, and what has to happen next. It is also a record of what you did not see, which matters as much.

How to fill it in

  • Record the stage of construction and the work in progress. It tells a reader later what could and couldn't be seen.
  • Tie every observation to a reference: sheet, detail or spec section. "Window head flashing at W-3, per A-501/4, not installed" is useful; "flashing issues" is not.
  • Give each observation a clear action and an owner, even if the action is "none."
  • Carry open items forward until they're closed. The "previous visits" table keeps the thread from one report to the next.
  • Keep the limitation statement, or replace it with the wording your firm and your contract use.

More detail in the guide: Site inspection report template and checklist.

You can type into the blank fields before printing. Nothing you type is saved or sent anywhere. In the print dialog, choose Letter and turn off headers and footers.
Company / firm:
Phone / email:

Site Visit Report

Architect / engineer site visit during construction

Visit no. ________   Page ___ of ___
Project:
Firm's project no.:
Address:
Permit no.:
Owner:
Contractor:
Date / time of visit:
Weather:
Stage of construction: FoundationsStructureEnvelopeRough-in (MEP)Interiors / finishesSiteworkPunch / closeout
Estimated % complete:
Contract completion date:

Present at site

#NameCompanyRole
1
2
3
4

Purpose of visit

Work in progress at time of visit

Observations

Ref.: drawing sheet, detail or spec section. Action: none, correct, submit, RFI, or design team to review.

#LocationObservationRef.Action requiredBy
1
2
3
4
5
6
7
8

Items from previous visits

#Item (visit no. / item no.)StatusRemarks
1
2
3
4

RFIs, submittals and samples discussed

#No.SubjectStatusRemarks
1
2
3

Photos

#What the photo showsLocationObs. no.
1
2
3
4
Next visit (date or stage):
Contractor to notify before:
This report records conditions observed at the time of the visit. It is not an exhaustive or continuous inspection, does not cover concealed work, and does not relieve the contractor of its obligations under the contract documents.
Distribution: OwnerContractorDesign team / consultantsBuilding department (if required)Other: ________
Prepared by:
Signature:
License no. (if applicable):
Date:
Free printable template · Arazim Reports · arazim-eng.com/templates/site-visit-report/

Site visit reports on your letterhead

Arazim Reports turns your site notes and photos into a signed PDF on your own letterhead, with open items carried into the next visit.

Start free trial 14 days free, no credit card. Then $10/month for your first year.

FAQ

What is a site visit report in construction?

A written record of a visit by the architect, engineer or another consultant during construction: date, stage of work, people present, observations against the contract documents, required actions, open items and photos.

Is a site visit report the same as an inspection?

Usually not. Design-team site visits are periodic and are generally not exhaustive or continuous inspections. What your visits cover, and the wording you use, depend on your contract. Special inspections required by the building code are a separate service.

Is this template free to use?

Yes. Print it, save it as a PDF or type into the fields before printing. No sign-up is needed, and nothing you type is stored or sent anywhere.

How often should the architect visit the site?

As often as the owner-architect agreement requires, often at set intervals or at key stages. Plan visits before critical work is covered, such as reinforcement before a pour or framing before drywall.

This template is a general working form. It does not replace the requirements of your contract, your building department or your firm's procedures. Adapt it to your project.